(The house subpanel is where the old circuits are I want to gradually replace with new circuits which are all going to be in the new 200A panel. What if instead of a pull box I used the junction box to splice SER or SEU for the rest of the run, is that possible? I don't remember exactly what I have, I think I have 4/0 SER because I had a 14' piece I had bought for the service mast that I didn't use and I think I might've bought 2/0 or 1/0 SEU for upgrading the subpanel feeder in the house to 100 amps, which I'm not sure I am going to do. Plus I'd probably need to take time off work to go to an electric supply store.Īnother problem could come out of all this, my 1/0 cables might not be long enough with the conduit. Aurora 1930s fishing equipment store display photo lantern Kennedy tackle box. The best way to accurately cut the hole for an electrical box.
#Kennedy cut a hole in that box Patch#
gap around the box, so if the cut is sloppy, you will have to come back to patch it. The switch plates and outlet covers will not cover much more than a 3/16 in. MY PHOTOS - If more than 1 item is shown in a photo-. Make sure that they are tucked into the box, if the electrician did not do so already. I need a solution that isn't going to add $100 and if I need a box bigger than 8x8, that's going to add $100. (Most photos are in the good to very good condition range not factoring in the binder holes. I tend to think that in terms of having a sense of what the majority here have to offer, having been here longer than someone that joined this month, my experience is that asking for a code reference is perfectly reasonable.īy read on 314.28 is that I need 8x8 because my 3 conductors of 1/0 would require a 1-1/4" conduit, so if my interpretation of the last paragraph of 314.28 (a) 2 is off then that would be information that would be helpful.
#Kennedy cut a hole in that box how to#
But let me just say that I've been working through rewiring the house among other things since I bought it in August of last year and I've been coming here with questions to help me understand how to do it correctly.

I've been a little pissy ever since the inspection yesterday, particularly with the service mast bracing the inspector is requiring even though going by the attachment point like the code and the POCO says it isn't required.